Case study of cutter soil mixing (CSM) method on hard soil conditions

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

A vertical cut off wall for water barrier was constructed at the final landfill disposal site in Oita prefecture of Japan to prevent the inflow of groundwater from the surroundings of the landfill site and leakage of leachate (sewage) to the outside. Due to existence of hard rock formations existed in the target ground to construct the cut off wall for water barrier, a Trench cutting Re-mixing Deep wall (TRD) construction method using a pre-drilling by a double rock auger in combination was planned for excavation of cut off wall for water barrier, initially. However, if this plan was adopted, there should be tight schedule for the construction due to pre-drilling. The alternative with CSM (Cutter Soil Mixing) construction method which does not require pre-drilling even in hard rock formation was proposed and the excavation was carried out with CSM method against relatively less hard rock formations. Also, a new machine imported from overseas was used for CSM construction method. Since, in Japan, there is no previous experience for drilling of hard formation layer with the new CSM machine, a pre-test was carried out. In the pre-test, the quality of the soil mixing wall and its drilling capacity against the hard rock formation were checked. The pre-test result was included in the construction cycle for CSM method with the new machine. From this point of view, case study of construction with CSM method which was applied to vertical cut off wall for water barrier of waste landfill waste disposal site in Japan is described and the pre-test performance of rock drilling is summarized in this paper.

Original languageEnglish
Title of host publicationISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018
PublisherInternational Society for Rock Mechanics
ISBN (Electronic)9789811190032
Publication statusPublished - Jan 1 2018
Event10th Asian Rock Mechanics Symposium, ARMS 2018 - Singapore, Singapore
Duration: Oct 29 2018Nov 3 2018

Publication series

NameISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018

Conference

Conference10th Asian Rock Mechanics Symposium, ARMS 2018
CountrySingapore
CitySingapore
Period10/29/1811/3/18

Fingerprint

hard soil
cutters
soils
drilling
cutoff wall
Soils
hard rock
rocks
Drilling
landfills
Rocks
construction method
cut-off
soil
Land fill
landfill
Japan
excavation
Water
Excavation

All Science Journal Classification (ASJC) codes

  • Geochemistry and Petrology
  • Geophysics

Cite this

Sakuma, S., Shimada, H., & Sasaoka, T. (2018). Case study of cutter soil mixing (CSM) method on hard soil conditions. In ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018 (ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018). International Society for Rock Mechanics.

Case study of cutter soil mixing (CSM) method on hard soil conditions. / Sakuma, Seiya; Shimada, Hideki; Sasaoka, Takashi.

ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018. International Society for Rock Mechanics, 2018. (ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Sakuma, S, Shimada, H & Sasaoka, T 2018, Case study of cutter soil mixing (CSM) method on hard soil conditions. in ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018. ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018, International Society for Rock Mechanics, 10th Asian Rock Mechanics Symposium, ARMS 2018, Singapore, Singapore, 10/29/18.
Sakuma S, Shimada H, Sasaoka T. Case study of cutter soil mixing (CSM) method on hard soil conditions. In ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018. International Society for Rock Mechanics. 2018. (ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018).
Sakuma, Seiya ; Shimada, Hideki ; Sasaoka, Takashi. / Case study of cutter soil mixing (CSM) method on hard soil conditions. ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018. International Society for Rock Mechanics, 2018. (ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018).
@inproceedings{0ed0212893864b07a1c7543b62f95e36,
title = "Case study of cutter soil mixing (CSM) method on hard soil conditions",
abstract = "A vertical cut off wall for water barrier was constructed at the final landfill disposal site in Oita prefecture of Japan to prevent the inflow of groundwater from the surroundings of the landfill site and leakage of leachate (sewage) to the outside. Due to existence of hard rock formations existed in the target ground to construct the cut off wall for water barrier, a Trench cutting Re-mixing Deep wall (TRD) construction method using a pre-drilling by a double rock auger in combination was planned for excavation of cut off wall for water barrier, initially. However, if this plan was adopted, there should be tight schedule for the construction due to pre-drilling. The alternative with CSM (Cutter Soil Mixing) construction method which does not require pre-drilling even in hard rock formation was proposed and the excavation was carried out with CSM method against relatively less hard rock formations. Also, a new machine imported from overseas was used for CSM construction method. Since, in Japan, there is no previous experience for drilling of hard formation layer with the new CSM machine, a pre-test was carried out. In the pre-test, the quality of the soil mixing wall and its drilling capacity against the hard rock formation were checked. The pre-test result was included in the construction cycle for CSM method with the new machine. From this point of view, case study of construction with CSM method which was applied to vertical cut off wall for water barrier of waste landfill waste disposal site in Japan is described and the pre-test performance of rock drilling is summarized in this paper.",
author = "Seiya Sakuma and Hideki Shimada and Takashi Sasaoka",
year = "2018",
month = "1",
day = "1",
language = "English",
series = "ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018",
publisher = "International Society for Rock Mechanics",
booktitle = "ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018",

}

TY - GEN

T1 - Case study of cutter soil mixing (CSM) method on hard soil conditions

AU - Sakuma, Seiya

AU - Shimada, Hideki

AU - Sasaoka, Takashi

PY - 2018/1/1

Y1 - 2018/1/1

N2 - A vertical cut off wall for water barrier was constructed at the final landfill disposal site in Oita prefecture of Japan to prevent the inflow of groundwater from the surroundings of the landfill site and leakage of leachate (sewage) to the outside. Due to existence of hard rock formations existed in the target ground to construct the cut off wall for water barrier, a Trench cutting Re-mixing Deep wall (TRD) construction method using a pre-drilling by a double rock auger in combination was planned for excavation of cut off wall for water barrier, initially. However, if this plan was adopted, there should be tight schedule for the construction due to pre-drilling. The alternative with CSM (Cutter Soil Mixing) construction method which does not require pre-drilling even in hard rock formation was proposed and the excavation was carried out with CSM method against relatively less hard rock formations. Also, a new machine imported from overseas was used for CSM construction method. Since, in Japan, there is no previous experience for drilling of hard formation layer with the new CSM machine, a pre-test was carried out. In the pre-test, the quality of the soil mixing wall and its drilling capacity against the hard rock formation were checked. The pre-test result was included in the construction cycle for CSM method with the new machine. From this point of view, case study of construction with CSM method which was applied to vertical cut off wall for water barrier of waste landfill waste disposal site in Japan is described and the pre-test performance of rock drilling is summarized in this paper.

AB - A vertical cut off wall for water barrier was constructed at the final landfill disposal site in Oita prefecture of Japan to prevent the inflow of groundwater from the surroundings of the landfill site and leakage of leachate (sewage) to the outside. Due to existence of hard rock formations existed in the target ground to construct the cut off wall for water barrier, a Trench cutting Re-mixing Deep wall (TRD) construction method using a pre-drilling by a double rock auger in combination was planned for excavation of cut off wall for water barrier, initially. However, if this plan was adopted, there should be tight schedule for the construction due to pre-drilling. The alternative with CSM (Cutter Soil Mixing) construction method which does not require pre-drilling even in hard rock formation was proposed and the excavation was carried out with CSM method against relatively less hard rock formations. Also, a new machine imported from overseas was used for CSM construction method. Since, in Japan, there is no previous experience for drilling of hard formation layer with the new CSM machine, a pre-test was carried out. In the pre-test, the quality of the soil mixing wall and its drilling capacity against the hard rock formation were checked. The pre-test result was included in the construction cycle for CSM method with the new machine. From this point of view, case study of construction with CSM method which was applied to vertical cut off wall for water barrier of waste landfill waste disposal site in Japan is described and the pre-test performance of rock drilling is summarized in this paper.

UR - http://www.scopus.com/inward/record.url?scp=85064241699&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85064241699&partnerID=8YFLogxK

M3 - Conference contribution

T3 - ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018

BT - ISRM International Symposium - 10th Asian Rock Mechanics Symposium, ARMS 2018

PB - International Society for Rock Mechanics

ER -