繰り返し型建築工事におけるTOCを用いた工程計画に関する研究

Translated title of the contribution: CONSTRUCTION PLANNING OF REPETITIVE WORK WITH THEORY OF CONSTRAINTS

植田 浩二, 古阪 秀三, 藤沢 克樹, 室谷 泰蔵, 金多 隆

Research output: Contribution to journalArticle

Abstract

The daily number of work labor is radical changeable in a jobsite when the contractors build a construction project. To improve this situation, various construction-planning methods were studied. But in recent years, because the building become high-rise and large-scale, it is very difficult to plan schedule with effective building production using past planning method, and construction planning included repetitive schedule is frequently planned. There are many past studies about construction planning of repetitive work, but until now, schedule planning is still depended on experience of the manager of construction site. Then, in this paper, the authors build a model of repetitive work, and search the optimization of this schedule planning with theory of constraints.
Translated title of the contributionCONSTRUCTION PLANNING OF REPETITIVE WORK WITH THEORY OF CONSTRAINTS
Original languageJapanese
Pages (from-to)281-288
Number of pages8
Journal日本建築学会計画系論文集
Volume67
Issue number557
DOIs
Publication statusPublished - 2002
Externally publishedYes

Fingerprint Dive into the research topics of 'CONSTRUCTION PLANNING OF REPETITIVE WORK WITH THEORY OF CONSTRAINTS'. Together they form a unique fingerprint.

Cite this