Decentralized scheduling algorithm for manufacturing plants reguiring frequent repairs

Kazuhiro Takeda, Ken Ichi Yunoki, Yoshifumi Tsuge, Hisayoshi Matsuyama

Research output: Contribution to journalArticle

2 Citations (Scopus)

Abstract

Eguipment repair, eguipment failure, inferior goods, and urgent orders are major obstacles for scheduled production, and contribute to low productivity and long lead-time in manufacturing plants with incomplete production technology. This paper presents a decentralized scheduling algorithm under the assumption that proper preventive repairs can decrease the occurrence of equipment failure and inferior goods. This algorithm can realize high productivity and short lead-time and be hardly affected by frequent equipment repair. The effectiveness of this algorithm is demonstrated by simulations of a plant model based on real plant manufacturing application specified integrated circuits.

Original languageEnglish
Pages (from-to)544-545
Number of pages2
JournalKagaku Kogaku Ronbunshu
Volume24
Issue number4
Publication statusPublished - Jul 1998

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Materials Science (miscellaneous)

Cite this