Management of change for plant alarm system based on business process model of plant lifecycle engineering

Kazuhiro Takeda, Takashi Hamaguchi, Naoki Kimura, Masaru Noda

Research output: Contribution to journalArticle

2 Citations (Scopus)

Abstract

Te alarm management lifecycle model of ISA (International Society of Automation) establishes recommended pro-cesses for a plant alarm system. To realize the lifecycle, a BPM (business process model) for appropriate management of change in the plant alarm system is required. Te following two-step approach will be effective to manage change in the plant alarm system. Te frst step is to construct a BPM in accordance with the lifecycle based on the BPM of plant life- cycle engineering. Te second step is to develop a workflow for management of change in the plant alarm system. Te BPM and the business flow should not only list activities of the BPM but also specify the information to be shared and exchanged between activities, the tools and methods to be used, and the requirements of additional tools and methods for design or performance monitoring of the plant alarm system. This paper introduces the proposed tools and meth- ods for design and performance monitoring of a plant alarm system.

Original languageEnglish
Pages (from-to)224-229
Number of pages6
Journalkagaku kogaku ronbunshu
Volume40
Issue number3
DOIs
Publication statusPublished - Jan 1 2014

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Chemistry(all)
  • Chemical Engineering(all)

Cite this