This paper presents a study on the development of a performance matrix to measure the new product development project performance for a small car producer in Malaysia. This study was carried out through open-ended interview sessions, involving a couple of project managers, a new product introduction manager and senior product planning manager and engineers. The questionnaires were developed based on the literatures and pre-tested prior the interview sessions. The feedbacks were used to identify the most important internal and external performance outcomes that crucial to the car producer. The development lead-time represents the efficiency, while the market share represents the effectiveness of the product development process. The performance matrix was successfully developed and the relation between the development lead time and market share is asymmetric. This performance matrix is best used for comparing NPD performances between plan and actual of a developed project, as well as between actual performances of a previous project and a new project that are having a similar project scopes and contents. The application of the performance matrix through a case study indicates that the success or failure status of the new product development project can be determined. The performance matrix is found to be viable and suitable for this indigenous car producer.

Original languageEnglish
Article number012001
JournalIOP Conference Series: Materials Science and Engineering
Volume627
Issue number1
DOIs
Publication statusPublished - Oct 18 2019
Event4th International Conference on Design and Manufacturing Engineering - Geelong, Australia
Duration: Jul 15 2019Jul 17 2019

Fingerprint

Product development
Managers
Railroad cars
Lead
Feedback
Engineers
Planning
neodymium pyrocatechin disulfonate

All Science Journal Classification (ASJC) codes

  • Materials Science(all)
  • Engineering(all)

Cite this

Measuring effectiveness and efficiency of a new product development project using performance matrix-The PROTON case. / Boejang, H.; Hassan, M. Z.; Mokudai, T.; Ariff, H.; Esa, S.

In: IOP Conference Series: Materials Science and Engineering, Vol. 627, No. 1, 012001, 18.10.2019.

Research output: Contribution to journalConference article

@article{04012e9376804507be10f30bd7cb4134,
title = "Measuring effectiveness and efficiency of a new product development project using performance matrix-The PROTON case",
abstract = "This paper presents a study on the development of a performance matrix to measure the new product development project performance for a small car producer in Malaysia. This study was carried out through open-ended interview sessions, involving a couple of project managers, a new product introduction manager and senior product planning manager and engineers. The questionnaires were developed based on the literatures and pre-tested prior the interview sessions. The feedbacks were used to identify the most important internal and external performance outcomes that crucial to the car producer. The development lead-time represents the efficiency, while the market share represents the effectiveness of the product development process. The performance matrix was successfully developed and the relation between the development lead time and market share is asymmetric. This performance matrix is best used for comparing NPD performances between plan and actual of a developed project, as well as between actual performances of a previous project and a new project that are having a similar project scopes and contents. The application of the performance matrix through a case study indicates that the success or failure status of the new product development project can be determined. The performance matrix is found to be viable and suitable for this indigenous car producer.",
author = "H. Boejang and Hassan, {M. Z.} and T. Mokudai and H. Ariff and S. Esa",
year = "2019",
month = "10",
day = "18",
doi = "10.1088/1757-899X/627/1/012001",
language = "English",
volume = "627",
journal = "IOP Conference Series: Materials Science and Engineering",
issn = "1757-8981",
publisher = "IOP Publishing Ltd.",
number = "1",

}

TY - JOUR

T1 - Measuring effectiveness and efficiency of a new product development project using performance matrix-The PROTON case

AU - Boejang, H.

AU - Hassan, M. Z.

AU - Mokudai, T.

AU - Ariff, H.

AU - Esa, S.

PY - 2019/10/18

Y1 - 2019/10/18

N2 - This paper presents a study on the development of a performance matrix to measure the new product development project performance for a small car producer in Malaysia. This study was carried out through open-ended interview sessions, involving a couple of project managers, a new product introduction manager and senior product planning manager and engineers. The questionnaires were developed based on the literatures and pre-tested prior the interview sessions. The feedbacks were used to identify the most important internal and external performance outcomes that crucial to the car producer. The development lead-time represents the efficiency, while the market share represents the effectiveness of the product development process. The performance matrix was successfully developed and the relation between the development lead time and market share is asymmetric. This performance matrix is best used for comparing NPD performances between plan and actual of a developed project, as well as between actual performances of a previous project and a new project that are having a similar project scopes and contents. The application of the performance matrix through a case study indicates that the success or failure status of the new product development project can be determined. The performance matrix is found to be viable and suitable for this indigenous car producer.

AB - This paper presents a study on the development of a performance matrix to measure the new product development project performance for a small car producer in Malaysia. This study was carried out through open-ended interview sessions, involving a couple of project managers, a new product introduction manager and senior product planning manager and engineers. The questionnaires were developed based on the literatures and pre-tested prior the interview sessions. The feedbacks were used to identify the most important internal and external performance outcomes that crucial to the car producer. The development lead-time represents the efficiency, while the market share represents the effectiveness of the product development process. The performance matrix was successfully developed and the relation between the development lead time and market share is asymmetric. This performance matrix is best used for comparing NPD performances between plan and actual of a developed project, as well as between actual performances of a previous project and a new project that are having a similar project scopes and contents. The application of the performance matrix through a case study indicates that the success or failure status of the new product development project can be determined. The performance matrix is found to be viable and suitable for this indigenous car producer.

UR - http://www.scopus.com/inward/record.url?scp=85074946961&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85074946961&partnerID=8YFLogxK

U2 - 10.1088/1757-899X/627/1/012001

DO - 10.1088/1757-899X/627/1/012001

M3 - Conference article

AN - SCOPUS:85074946961

VL - 627

JO - IOP Conference Series: Materials Science and Engineering

JF - IOP Conference Series: Materials Science and Engineering

SN - 1757-8981

IS - 1

M1 - 012001

ER -