Ne water construction by using japanese pipe jacking machines in singapore

Toru Sato, Tony Suzuki, Hideki Shimada, Takashi Sasaoka, Kukuo Matsui

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Citation (Scopus)

Abstract

Public Utilities Board (PUB), Singapore has announced pipeline project to provide NEwater (highest grade of industrial water) in 2007 through 2008 this time. As for this NEwater, 40% of treated this NEwater is assigned by Shell and rest of it is for other semiconductor/electronic parts makers. Most of pipeline between two treatment plants in has been planted by open cut. Some of lines are partially planed by pipe jacking especially in line crossing area with road including highway, river and rail road. These jacking lines are fragmentary laying and collected in project PJ01 and PJ02. Soil condition on jacking line is extending to wide kind of soil such as marine clay, sand, silt, rock area...etc. The Japanese pipe jacking technology that is the developed nation of the pipe jacking method of construction is introduced to lead this project to the success.

Original languageEnglish
Title of host publication28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010
Pages415-423
Number of pages9
Publication statusPublished - Dec 1 2010
Event28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010 - , Singapore
Duration: Nov 8 2010Nov 10 2010

Publication series

Name28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010

Other

Other28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010
CountrySingapore
Period11/8/1011/10/10

Fingerprint

pipe jacking
Singapore
Pipe
road
roads
soils
Pipelines
water
Public utilities
Soils
Water
Silt
rails
rivers
sands
clays
Rails
grade
silt
Clay

All Science Journal Classification (ASJC) codes

  • Geology
  • Geophysics
  • Geotechnical Engineering and Engineering Geology
  • Civil and Structural Engineering
  • Mechanical Engineering
  • Building and Construction

Cite this

Sato, T., Suzuki, T., Shimada, H., Sasaoka, T., & Matsui, K. (2010). Ne water construction by using japanese pipe jacking machines in singapore. In 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010 (pp. 415-423). (28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010).

Ne water construction by using japanese pipe jacking machines in singapore. / Sato, Toru; Suzuki, Tony; Shimada, Hideki; Sasaoka, Takashi; Matsui, Kukuo.

28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010. 2010. p. 415-423 (28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Sato, T, Suzuki, T, Shimada, H, Sasaoka, T & Matsui, K 2010, Ne water construction by using japanese pipe jacking machines in singapore. in 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010. 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010, pp. 415-423, 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010, Singapore, 11/8/10.
Sato T, Suzuki T, Shimada H, Sasaoka T, Matsui K. Ne water construction by using japanese pipe jacking machines in singapore. In 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010. 2010. p. 415-423. (28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010).
Sato, Toru ; Suzuki, Tony ; Shimada, Hideki ; Sasaoka, Takashi ; Matsui, Kukuo. / Ne water construction by using japanese pipe jacking machines in singapore. 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010. 2010. pp. 415-423 (28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010).
@inproceedings{1ea14613d43b4f62afea35983dac2a6e,
title = "Ne water construction by using japanese pipe jacking machines in singapore",
abstract = "Public Utilities Board (PUB), Singapore has announced pipeline project to provide NEwater (highest grade of industrial water) in 2007 through 2008 this time. As for this NEwater, 40{\%} of treated this NEwater is assigned by Shell and rest of it is for other semiconductor/electronic parts makers. Most of pipeline between two treatment plants in has been planted by open cut. Some of lines are partially planed by pipe jacking especially in line crossing area with road including highway, river and rail road. These jacking lines are fragmentary laying and collected in project PJ01 and PJ02. Soil condition on jacking line is extending to wide kind of soil such as marine clay, sand, silt, rock area...etc. The Japanese pipe jacking technology that is the developed nation of the pipe jacking method of construction is introduced to lead this project to the success.",
author = "Toru Sato and Tony Suzuki and Hideki Shimada and Takashi Sasaoka and Kukuo Matsui",
year = "2010",
month = "12",
day = "1",
language = "English",
isbn = "9781617821899",
series = "28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010",
pages = "415--423",
booktitle = "28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010",

}

TY - GEN

T1 - Ne water construction by using japanese pipe jacking machines in singapore

AU - Sato, Toru

AU - Suzuki, Tony

AU - Shimada, Hideki

AU - Sasaoka, Takashi

AU - Matsui, Kukuo

PY - 2010/12/1

Y1 - 2010/12/1

N2 - Public Utilities Board (PUB), Singapore has announced pipeline project to provide NEwater (highest grade of industrial water) in 2007 through 2008 this time. As for this NEwater, 40% of treated this NEwater is assigned by Shell and rest of it is for other semiconductor/electronic parts makers. Most of pipeline between two treatment plants in has been planted by open cut. Some of lines are partially planed by pipe jacking especially in line crossing area with road including highway, river and rail road. These jacking lines are fragmentary laying and collected in project PJ01 and PJ02. Soil condition on jacking line is extending to wide kind of soil such as marine clay, sand, silt, rock area...etc. The Japanese pipe jacking technology that is the developed nation of the pipe jacking method of construction is introduced to lead this project to the success.

AB - Public Utilities Board (PUB), Singapore has announced pipeline project to provide NEwater (highest grade of industrial water) in 2007 through 2008 this time. As for this NEwater, 40% of treated this NEwater is assigned by Shell and rest of it is for other semiconductor/electronic parts makers. Most of pipeline between two treatment plants in has been planted by open cut. Some of lines are partially planed by pipe jacking especially in line crossing area with road including highway, river and rail road. These jacking lines are fragmentary laying and collected in project PJ01 and PJ02. Soil condition on jacking line is extending to wide kind of soil such as marine clay, sand, silt, rock area...etc. The Japanese pipe jacking technology that is the developed nation of the pipe jacking method of construction is introduced to lead this project to the success.

UR - http://www.scopus.com/inward/record.url?scp=84877109304&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84877109304&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:84877109304

SN - 9781617821899

T3 - 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010

SP - 415

EP - 423

BT - 28th International No-Dig Conference and Exhibition 2010, NO-DIG 2010

ER -