The objectives that this paper has aimed at are as follows: 1) To develop a system which can quantitatively indicate the influence on the project cost by focusing on the finish time of working drawings and shop drawings. 2) To propose the method of optimizing the schedule of making working drawings and shop drawings under consideration of various constrained conditions. Using this system, the owner of the project can get theoretical background for the adjustment of the conflict between the design team and the construction team from the point of the optimization of the project cost in the schedule of making working drawings and shop drawings. As local search is one of the most effective heuristic algorithms for optimization problem, it is applied to the optimization of the schedule of making working drawings and shop drawings.
Translated title of the contributionSTUDY ON WORKING DRAWINGS AND SHOP DRAWINGS SCHEDULING
Original languageJapanese
Pages (from-to)223-230
Number of pages8
Journal日本建築学会計画系論文集
Volume66
Issue number548
DOIs
Publication statusPublished - 2001

Fingerprint Dive into the research topics of 'STUDY ON WORKING DRAWINGS AND SHOP DRAWINGS SCHEDULING'. Together they form a unique fingerprint.

  • Cite this