TY - JOUR
T1 - Tests of superconducting traction transformer for railway rolling stock
AU - Kamijo, H.
AU - Hata, H.
AU - Fujimoto, H.
AU - Inoue, A.
AU - Nagashima, K.
AU - Ikeda, K.
AU - Iwakuma, M.
AU - Funaki, K.
AU - Sanuki, Y.
AU - Tomioka, A.
AU - Yamada, H.
AU - Uwamori, K.
AU - Yoshida, S.
PY - 2007/6/1
Y1 - 2007/6/1
N2 - We have been developing a lightweight and high-efficiency superconducting traction transformer for railway rolling stock. We designed and fabricated a prototype superconducting traction transformer of a floor-mount type for Shinkansen rolling stock. In this study, we present test results such as type test, system test and vibration test. We performed the type test in accordance with JIS, E5007. In this test, we measured the basic electrical characteristics. In the system test, we tested the transformer with a dynamic simulator for rolling stock, as a converter connected at secondary winding, and verified the operating characteristics. We performed vibration tests in accordance with JIS, E4031, vibrating the transformer on a shaking table with three-dimensional movement. As a result, we could verify that the transformer satisfied the requirement almost exactly as initially planned.
AB - We have been developing a lightweight and high-efficiency superconducting traction transformer for railway rolling stock. We designed and fabricated a prototype superconducting traction transformer of a floor-mount type for Shinkansen rolling stock. In this study, we present test results such as type test, system test and vibration test. We performed the type test in accordance with JIS, E5007. In this test, we measured the basic electrical characteristics. In the system test, we tested the transformer with a dynamic simulator for rolling stock, as a converter connected at secondary winding, and verified the operating characteristics. We performed vibration tests in accordance with JIS, E4031, vibrating the transformer on a shaking table with three-dimensional movement. As a result, we could verify that the transformer satisfied the requirement almost exactly as initially planned.
UR - http://www.scopus.com/inward/record.url?scp=34547467208&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=34547467208&partnerID=8YFLogxK
U2 - 10.1109/TASC.2007.898887
DO - 10.1109/TASC.2007.898887
M3 - Article
AN - SCOPUS:34547467208
VL - 17
SP - 1927
EP - 1930
JO - IEEE Transactions on Applied Superconductivity
JF - IEEE Transactions on Applied Superconductivity
SN - 1051-8223
IS - 2
ER -