Upgrade of the level-0 trigger system for BNL-E949

T. Yoshioka, M. Nomachi, A. Artamanov, B. Bhuyan, J. S. Frank, T. Fujiwara, K. Higa, S. H. Kettell, T. K. Komatsubara, A. Konaka, A. Kozjevnikov, A. Kushnirenko, N. Muramatsu, T. Nakano, T. Nomura, S. Petrenko, R. Poutissou, G. Redlinger, T. Sekiguchi, T. ShinkawaS. Sugimoto, T. Tsunemi

Research output: Contribution to journalArticle

7 Citations (Scopus)

Abstract

A new programmable trigger board and digital mean-timer modules using complex programmable logic device have been introduced to the trigger system of the BNL-E949 experiment. The online dead time was reduced from 4.0% to 1.7% by introducing an on-chip prescaler to the programmable trigger board. The acceptance loss of the online photon veto was reduced from 4.9% to 1.8% by introducing the mean-timer modules.

Original languageEnglish
Pages (from-to)334-339
Number of pages6
JournalIEEE Transactions on Nuclear Science
Volume51
Issue number3 I
DOIs
Publication statusPublished - Jun 1 2004

All Science Journal Classification (ASJC) codes

  • Nuclear and High Energy Physics
  • Nuclear Energy and Engineering
  • Electrical and Electronic Engineering

Fingerprint Dive into the research topics of 'Upgrade of the level-0 trigger system for BNL-E949'. Together they form a unique fingerprint.

  • Cite this

    Yoshioka, T., Nomachi, M., Artamanov, A., Bhuyan, B., Frank, J. S., Fujiwara, T., Higa, K., Kettell, S. H., Komatsubara, T. K., Konaka, A., Kozjevnikov, A., Kushnirenko, A., Muramatsu, N., Nakano, T., Nomura, T., Petrenko, S., Poutissou, R., Redlinger, G., Sekiguchi, T., ... Tsunemi, T. (2004). Upgrade of the level-0 trigger system for BNL-E949. IEEE Transactions on Nuclear Science, 51(3 I), 334-339. https://doi.org/10.1109/TNS.2004.828867