A case study of requirements elicitation process with changes

Takako Nakatani, Shouzo Hori, Naoyasu Ubayashi, Keiichi Katamine, Masaaki Hashimoto

研究成果: Contribution to journalArticle査読

4 被引用数 (Scopus)

抄録

Requirements changes sometimes cause a project to fail. A lot of projects now follow incremental development processes so that new requirements and requirements changes can be incorporated as soon as possible. These processes are called integrated requirements processes, which function to integrate requirements processes with other developmental processes. We have quantitatively and qualitatively investigated the requirements processes of a specific project from beginning to end. Our focus is to clarify the types of necessary requirements based on the components contained within a certain portion of the software architecture. Further, each type reveals its typical requirements processes through its own rationale. This case study is a system to manage the orders and services of a restaurant. In this paper, we introduce the case and categorize its requirements processes based on the components of the system and the qualitative characteristics of ISO-9126. We could identify seven categories of the typical requirements process to be managed and/or controlled. Each category reveals its typical requirements processes and their characteristics. The case study is our first step of practical integrated requirements engineering.

本文言語英語
ページ(範囲)2182-2189
ページ数8
ジャーナルIEICE Transactions on Information and Systems
E93-D
8
DOI
出版ステータス出版済み - 8 2010

All Science Journal Classification (ASJC) codes

  • Software
  • Hardware and Architecture
  • Computer Vision and Pattern Recognition
  • Electrical and Electronic Engineering
  • Artificial Intelligence

フィンガープリント 「A case study of requirements elicitation process with changes」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル