Construction of supply chain management with packing companies in the surface treatment steel manufacturing plant

Akira Yamamoto, Kenji Yamamoto, Kazuhiro Takeda, Yoshifumi Tsuge

研究成果: ジャーナルへの寄稿記事

1 引用 (Scopus)

抄録

Kudamatsu plant projected the three-year mid term managerial program in 2002, promoting the integration and reorganization of subsidiary companies and reviewing the material and supplemental material procurement operation. As a part of this program, manufacturing for packing material and packing operations, which work had been so far divided into 6 subsidiaries, were integrated and entrusted to a newly founded single company. Then we tied up S.C.M. (Supply Chain Management) with it. Practically, packing operation was not involved in production control system. That is the reason some troubles frequently occurred, such as delivery delays due to the packing stagnation and the conflicting imbalance between the production and the packing operational flow. Therefore, along with S.C.M. construction, packing operation was included into the production control system in which overall reformation was being made at the time. Our purpose was to establish a system of manufacturing and packing section that can link together in the time scheduling. Integration and reorganization of subsidiary companies started in October 2002. Packing control system started in October 2004, and now demonstrating noticeable results such as labor saving in packing worker, improvement of material flow, packing productivity, and delivery date achievement level.

元の言語英語
ページ(範囲)739-743
ページ数5
ジャーナルTetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan
91
発行部数9
DOI
出版物ステータス出版済み - 1 1 2005

Fingerprint

Steel
Supply chain management
surface treatment
Surface treatment
manufacturing
steels
Industry
subsidiaries
Production control
Control systems
delivery
procurement
labor
reviewing
scheduling
productivity
Productivity
Scheduling
Personnel

All Science Journal Classification (ASJC) codes

  • Condensed Matter Physics
  • Physical and Theoretical Chemistry
  • Metals and Alloys
  • Materials Chemistry

これを引用

Construction of supply chain management with packing companies in the surface treatment steel manufacturing plant. / Yamamoto, Akira; Yamamoto, Kenji; Takeda, Kazuhiro; Tsuge, Yoshifumi.

:: Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan, 巻 91, 番号 9, 01.01.2005, p. 739-743.

研究成果: ジャーナルへの寄稿記事

@article{1b85c0839e22403a9e988c52c60fdee6,
title = "Construction of supply chain management with packing companies in the surface treatment steel manufacturing plant",
abstract = "Kudamatsu plant projected the three-year mid term managerial program in 2002, promoting the integration and reorganization of subsidiary companies and reviewing the material and supplemental material procurement operation. As a part of this program, manufacturing for packing material and packing operations, which work had been so far divided into 6 subsidiaries, were integrated and entrusted to a newly founded single company. Then we tied up S.C.M. (Supply Chain Management) with it. Practically, packing operation was not involved in production control system. That is the reason some troubles frequently occurred, such as delivery delays due to the packing stagnation and the conflicting imbalance between the production and the packing operational flow. Therefore, along with S.C.M. construction, packing operation was included into the production control system in which overall reformation was being made at the time. Our purpose was to establish a system of manufacturing and packing section that can link together in the time scheduling. Integration and reorganization of subsidiary companies started in October 2002. Packing control system started in October 2004, and now demonstrating noticeable results such as labor saving in packing worker, improvement of material flow, packing productivity, and delivery date achievement level.",
author = "Akira Yamamoto and Kenji Yamamoto and Kazuhiro Takeda and Yoshifumi Tsuge",
year = "2005",
month = "1",
day = "1",
doi = "10.2355/tetsutohagane1955.91.9_739",
language = "English",
volume = "91",
pages = "739--743",
journal = "Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan",
issn = "0021-1575",
publisher = "一般社団法人 日本鉄鋼協会",
number = "9",

}

TY - JOUR

T1 - Construction of supply chain management with packing companies in the surface treatment steel manufacturing plant

AU - Yamamoto, Akira

AU - Yamamoto, Kenji

AU - Takeda, Kazuhiro

AU - Tsuge, Yoshifumi

PY - 2005/1/1

Y1 - 2005/1/1

N2 - Kudamatsu plant projected the three-year mid term managerial program in 2002, promoting the integration and reorganization of subsidiary companies and reviewing the material and supplemental material procurement operation. As a part of this program, manufacturing for packing material and packing operations, which work had been so far divided into 6 subsidiaries, were integrated and entrusted to a newly founded single company. Then we tied up S.C.M. (Supply Chain Management) with it. Practically, packing operation was not involved in production control system. That is the reason some troubles frequently occurred, such as delivery delays due to the packing stagnation and the conflicting imbalance between the production and the packing operational flow. Therefore, along with S.C.M. construction, packing operation was included into the production control system in which overall reformation was being made at the time. Our purpose was to establish a system of manufacturing and packing section that can link together in the time scheduling. Integration and reorganization of subsidiary companies started in October 2002. Packing control system started in October 2004, and now demonstrating noticeable results such as labor saving in packing worker, improvement of material flow, packing productivity, and delivery date achievement level.

AB - Kudamatsu plant projected the three-year mid term managerial program in 2002, promoting the integration and reorganization of subsidiary companies and reviewing the material and supplemental material procurement operation. As a part of this program, manufacturing for packing material and packing operations, which work had been so far divided into 6 subsidiaries, were integrated and entrusted to a newly founded single company. Then we tied up S.C.M. (Supply Chain Management) with it. Practically, packing operation was not involved in production control system. That is the reason some troubles frequently occurred, such as delivery delays due to the packing stagnation and the conflicting imbalance between the production and the packing operational flow. Therefore, along with S.C.M. construction, packing operation was included into the production control system in which overall reformation was being made at the time. Our purpose was to establish a system of manufacturing and packing section that can link together in the time scheduling. Integration and reorganization of subsidiary companies started in October 2002. Packing control system started in October 2004, and now demonstrating noticeable results such as labor saving in packing worker, improvement of material flow, packing productivity, and delivery date achievement level.

UR - http://www.scopus.com/inward/record.url?scp=27644432518&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=27644432518&partnerID=8YFLogxK

U2 - 10.2355/tetsutohagane1955.91.9_739

DO - 10.2355/tetsutohagane1955.91.9_739

M3 - Article

AN - SCOPUS:27644432518

VL - 91

SP - 739

EP - 743

JO - Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan

JF - Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan

SN - 0021-1575

IS - 9

ER -