繰り返し型建築工事におけるTOCを用いた工程計画に関する研究

植田 浩二, 古阪 秀三, 藤沢 克樹, 室谷 泰蔵, 金多 隆

研究成果: Contribution to journalArticle

抄録

The daily number of work labor is radical changeable in a jobsite when the contractors build a construction project. To improve this situation, various construction-planning methods were studied. But in recent years, because the building become high-rise and large-scale, it is very difficult to plan schedule with effective building production using past planning method, and construction planning included repetitive schedule is frequently planned. There are many past studies about construction planning of repetitive work, but until now, schedule planning is still depended on experience of the manager of construction site. Then, in this paper, the authors build a model of repetitive work, and search the optimization of this schedule planning with theory of constraints.
寄稿の翻訳タイトルCONSTRUCTION PLANNING OF REPETITIVE WORK WITH THEORY OF CONSTRAINTS
本文言語日本語
ページ(範囲)281-288
ページ数8
ジャーナル日本建築学会計画系論文集
67
557
DOI
出版ステータス出版済み - 2002
外部発表はい

フィンガープリント

「繰り返し型建築工事におけるTOCを用いた工程計画に関する研究」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル