TY - GEN
T1 - Numerical simulation of reinjected water return to production wells in Ogiri geothermal reservoir, Japan
AU - Itoi, Ryuichi
AU - Yamashita, Seiji
AU - Tanaka, Toshiaki
AU - Takayama, Junichi
PY - 2011/12/1
Y1 - 2011/12/1
N2 - Magnitude of return of reinjected water to production wells was evaluated by numerical simulations with TOUGH2 at the Ogiri geothermal field for 13 years operation. A function of specifying two kinds of fluid in TOUGH2 was used to distinguish reinjection water and deep recharge fluid. Production wells located relatively adjacent to reinjection zone showed high mass ratio of reinjected water to produced fluid.
AB - Magnitude of return of reinjected water to production wells was evaluated by numerical simulations with TOUGH2 at the Ogiri geothermal field for 13 years operation. A function of specifying two kinds of fluid in TOUGH2 was used to distinguish reinjection water and deep recharge fluid. Production wells located relatively adjacent to reinjection zone showed high mass ratio of reinjected water to produced fluid.
UR - http://www.scopus.com/inward/record.url?scp=84860859005&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84860859005&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84860859005
SN - 9781618394828
T3 - Transactions - Geothermal Resources Council
SP - 1437
EP - 1441
BT - Geothermal Resources Council Annual Meeting 2011, Geothermal 2011
T2 - Geothermal Resources Council Annual Meeting 2011, Geothermal 2011
Y2 - 23 October 2011 through 26 October 2011
ER -