TY - JOUR
T1 - Present status of Japanese tasks for lithium target facility under IFMIF/EVEDA
AU - Nakamura, Kazuyuki
AU - Furukawa, Tomohiro
AU - Hirakawa, Yasushi
AU - Kanemura, Takuji
AU - Kondo, Hiroo
AU - Ida, Mizuho
AU - Niitsuma, Shigeto
AU - Ohtaka, Masahiko
AU - Watanabe, Kazuyoshi
AU - Horiike, Hiroshi
AU - Hoashi, Eiji
AU - Suzuki, Sachiko
AU - Yamaoka, Nobuo
AU - Sugiura, Hirokazu
AU - Terai, Takayuki
AU - Suzuki, Akihiro
AU - Yagi, Juro
AU - Bannai, Mikiko
AU - Fukada, Satoshi
AU - Nakamura, Hiroo
AU - Edao, Yuki
AU - Tsuji, Yoshiyuki
AU - Furuya, Kazuyuki
PY - 2011/10
Y1 - 2011/10
N2 - In IFMIF/EVEDA, tasks for lithium target system consist of 5 validation tasks (LF1-5) and a design task (LF6), and are shared by Japan and Europe. Japan is covering LF1, LF2, LF4, LF5 and LF6, and JAEA as an Implementing Agency is organizing these tasks. Japanese universities contribute these tasks. The purpose of LF1 task is to construct and operate EVEDA Li test loop (ELTL) with diagnostics and purification systems for the validation of Li target facility. ELTL will be constructed at the end of February in 2011 and the operation will be started at the summer in 2011. LF2 and LF4 are basic research for the diagnostics and purification system, respectively. And LF2 and LF4 have also contributed the construction of the ELTL (LF1). LF5 is focusing on the remote handling for the replacement of the target assembly. Major deliverable of LF6 is finally engineering design report, which is assembled with all validation tasks, and this activity will be gradually enhanced to the end of IFMIF/EVEDA.
AB - In IFMIF/EVEDA, tasks for lithium target system consist of 5 validation tasks (LF1-5) and a design task (LF6), and are shared by Japan and Europe. Japan is covering LF1, LF2, LF4, LF5 and LF6, and JAEA as an Implementing Agency is organizing these tasks. Japanese universities contribute these tasks. The purpose of LF1 task is to construct and operate EVEDA Li test loop (ELTL) with diagnostics and purification systems for the validation of Li target facility. ELTL will be constructed at the end of February in 2011 and the operation will be started at the summer in 2011. LF2 and LF4 are basic research for the diagnostics and purification system, respectively. And LF2 and LF4 have also contributed the construction of the ELTL (LF1). LF5 is focusing on the remote handling for the replacement of the target assembly. Major deliverable of LF6 is finally engineering design report, which is assembled with all validation tasks, and this activity will be gradually enhanced to the end of IFMIF/EVEDA.
UR - http://www.scopus.com/inward/record.url?scp=80054046478&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=80054046478&partnerID=8YFLogxK
U2 - 10.1016/j.fusengdes.2011.04.033
DO - 10.1016/j.fusengdes.2011.04.033
M3 - Article
AN - SCOPUS:80054046478
SN - 0920-3796
VL - 86
SP - 2491
EP - 2494
JO - Fusion Engineering and Design
JF - Fusion Engineering and Design
IS - 9-11
ER -