抄録
<p>The survey was carried out again two years later on buildings that were completely surveyed just after the 2016 Kumamoto earthquake. The purpose of the survey is to quantify the relationship between damage level, construction year, structure type, etc. and the usage of the buildings after two years. This study revealed that about half of the buildings surveyed areas in Mashiki town do not exist. In addition, it was found that the continuous use rate of buildings is higher as the construction year of the affected building is newer, or the damage level is lower. Also, 37% of the continuously used buildings have been repaired, and some of buildings judged to be no damage by the exterior survey have also been repaired. 84% of newly constructed buildings were wooden structure and 71% were single story.</p>
寄稿の翻訳タイトル | Survey of Construction Situation in Mashiki Town Two Years After the 2016 Kumamoto Earthquakes |
---|---|
本文言語 | 日本語 |
ページ(範囲) | 1_21-1_33 |
ジャーナル | 日本地震工学会論文集 |
巻 | 19 |
号 | 1 |
DOI | |
出版ステータス | 出版済み - 2019 |