Test beams summary

研究成果: 会議への寄与タイプ論文

抄録

ILC detectors are required to have unprecedented precision. Achieving this requires significant investment for test beam activities to complete the detector R&D needed, to test prototypes and (later) to qualify final detector system designs, including integrated system test. This document summarizes the discussion at this workshop on the test beam facilities and detector R&D programs to be performed there.

元の言語英語
出版物ステータス出版済み - 12 1 2010
イベント2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010 - Beijing, 中国
継続期間: 3 26 20103 30 2010

その他

その他2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010
中国
Beijing
期間3/26/103/30/10

Fingerprint

detectors
systems engineering
prototypes

All Science Journal Classification (ASJC) codes

  • Nuclear and High Energy Physics

これを引用

Kawagoe, K. (2010). Test beams summary. 論文発表場所 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010, Beijing, 中国.

Test beams summary. / Kawagoe, Kiyotomo.

2010. 論文発表場所 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010, Beijing, 中国.

研究成果: 会議への寄与タイプ論文

Kawagoe, K 2010, 'Test beams summary' 論文発表場所 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010, Beijing, 中国, 3/26/10 - 3/30/10, .
Kawagoe K. Test beams summary. 2010. 論文発表場所 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010, Beijing, 中国.
Kawagoe, Kiyotomo. / Test beams summary. 論文発表場所 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010, Beijing, 中国.
@conference{03c796e27498491e8be77b04c0289fe9,
title = "Test beams summary",
abstract = "ILC detectors are required to have unprecedented precision. Achieving this requires significant investment for test beam activities to complete the detector R&D needed, to test prototypes and (later) to qualify final detector system designs, including integrated system test. This document summarizes the discussion at this workshop on the test beam facilities and detector R&D programs to be performed there.",
author = "Kiyotomo Kawagoe",
year = "2010",
month = "12",
day = "1",
language = "English",
note = "2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010 ; Conference date: 26-03-2010 Through 30-03-2010",

}

TY - CONF

T1 - Test beams summary

AU - Kawagoe, Kiyotomo

PY - 2010/12/1

Y1 - 2010/12/1

N2 - ILC detectors are required to have unprecedented precision. Achieving this requires significant investment for test beam activities to complete the detector R&D needed, to test prototypes and (later) to qualify final detector system designs, including integrated system test. This document summarizes the discussion at this workshop on the test beam facilities and detector R&D programs to be performed there.

AB - ILC detectors are required to have unprecedented precision. Achieving this requires significant investment for test beam activities to complete the detector R&D needed, to test prototypes and (later) to qualify final detector system designs, including integrated system test. This document summarizes the discussion at this workshop on the test beam facilities and detector R&D programs to be performed there.

UR - http://www.scopus.com/inward/record.url?scp=84884662553&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84884662553&partnerID=8YFLogxK

M3 - Paper

AN - SCOPUS:84884662553

ER -